Skip to main content

FACTORY & MANUFACTURING

Flexible Tank and Containment Manufacturing

Material preparation, cutting, hot-air welding, fitting installation and finished-product inspection are carried out in house.

Core Manufacturing Steps

FUUSHAN carries out material preparation, cutting, hot-air welding, fitting installation and finished-product inspection in house. Export packing is coordinated for each order.

Production Workflow

01

Material preparation

Raw materials, TPU, PVC and polymer-coated fabrics, are checked before production. Material selection is confirmed against the stored medium and project requirements.

02

Cutting

Components are cut to the confirmed dimensions, with panel and seam positions matched to approved drawings.

03

Hot-air welding

Hot-air welding joins components for most products, with parameters matched to the material and seam configuration.

04

Valve and fitting installation

Valves, flanges and fittings are installed with the confirmed port positions and sizes.

05

Assembly

Products are assembled to the confirmed configuration, with connections checked against the order before inspection.

06

Finished-product inspection and packing

Assembled products are inspected against the confirmed order before packing.

Material Preparation

TPU, PVC and polymer-coated fabrics are checked before production. Material selection is confirmed against the stored medium and project requirements.

Cutting and Welding

Components are cut to specification and joined by hot-air welding, the core process for most of our products. Where specified, the main seam is reinforced with an additional welded layer to improve seam durability and reduce the risk of leakage during normal use.

Hot-air welding production line at the FUUSHAN factory

Valve and Fitting Installation

Valves, flanges and fittings follow the confirmed quantities, positions and port sizes for the site piping and pump layout.

Assembly and Finished-Product Inspection

Assembled products are inspected against the confirmed configuration before packing.

Inspection covers the configuration against specification, seam and fitting checks, and testing as applicable to the product type.

Finished-product inspection at the factory

Related Capabilities

Request Supplier Information

Request manufacturing information for supplier qualification.

Tell us which process, document or inspection point your team needs to review. Availability and format are confirmed for the enquiry.

Request a Quote
Flexible Tank FactoryB2B Manufacturing
Request Quote